Click here to add header image(s)
chat
Contact
camera
View Gallery
menu
Menu
01444 258 588
Close

Hi. If you have any questions or require any specification documents, call us or send us a message here.

I consent to Westpark collecting my details from this form


Home / Case Studies / Case study: Mott McDonald

Case study: Mott McDonald


West Park were invited to tender for the Partitions, doors and tea points for this fast-paced fit out for Mott McDonald in Guildford. The programme was tight as the client had a deadline that had to be worked too. West Park worked well with the ODB management and handed over a very smart looking project on time and within budget. The Partition specification was simple 100mm solid with a 50mm stud and two layers of 12.5mm plasterboard to reach a sound rating of 48dB. The glass specification was 12.8mm single glazed acoustic glass in standard white aluminium channels to achieve a sound rating of 40dB.
Mott McDonald were occupying the office space directly opposite the new project site, so West Park had to work quietly and efficiently ensuring there was as little disruption to the existing floor as possible.
The deliveries into the building had to be carefully organised and supervised by our site foreman to make sure the building was kept as a safe and secure environment.

The details


Title: Mott McDonald
Client: ODB Projects
Location: Guildford
Contract Value: £30,000
01444 258 588

Hi. If you have any questions or require any specification documents, call us or send us a message here.

I consent to Westpark collecting my details from this form