Click here to add header image(s)
chat
Contact
camera
View Gallery
menu
Menu
01444 258 588
Close

Hi. If you have any questions or require any specification documents, call us or send us a message here.

    I consent to Westpark collecting my details from this form

    Home / Test Case study

    Case study: Brands2Life


    “Cityspace Management have found West Park to be very professional in all our dealings with them. They have delivered all projects on time, to the given budget and with excellent service.’ Andrew Seward – Managing Director”
    West Park constructed 100mm plasterboard partitions from raised floor to the existing SAS metal ceiling. The 100mm partition was made up of a 50mm metal stud and two layers of 12.5mm plasterboard with a 25mm isowool quilt in the cavity. The ceiling height was too high to run the glazing full height, so West Park constructed a 100mm bulkhead above the glazed modules that worked seamlessly with the 100mm solid around it. The timber doors were re-used from the previous floor plan but had to be removed and re-installed with the utmost care and attention to meet the clients high quality expectations.
    West Park were also asked to create a timber plywood feature detail in each of the meeting rooms. The detail ended up consisting of an unfinished Wisa Birch product that was pinned straight to the finished wall. The main reception consists of a much larger version that was laid out in a brick effect formation that really “wow’s” clients as they enter the reception area.

     

    b2l_5 Call us today

    The details


    Title: Brands2LifeClient: Cityspace Management Location: Southwark Street, Central London.Contract Value: £65,000 Download Case study 01444 258 588

    Hi. If you have any questions or require any specification documents, call us or send us a message here.

    I consent to Westpark collecting my details from this form